Simi Valley ADU ConstructionAguila Construction Inc · CSLB #925152ESEspañol(818) 355-2301

CSLB #925152 · Verify at CSLB

Attached ADUs: more living space joined to the house

An attached ADU on your Simi Valley house: the 850 and 1,000 sq ft floors, the 25-foot height rule, the old 50 percent cap HCD flagged, and stairs.

Licensed general building contractor since 2008: CSLB #925152, qualifier Paul V. Aguilar.

ADU built above an attached two-car garage with its own exterior stair and entry, in matching stucco and tile, AI-generated illustration
Illustration of an ADU above an attached garage.
LicenceCSLB #925152Class B General Building, issued November 2008. Verify at CSLB
Service areaSimi ValleyMoorpark, Thousand Oaks and nearby
PermitsCity of Simi ValleyBuilding & Safety Division, not Ventura County

An attached ADU shares at least one wall with your house but is a separate dwelling with its own entrance, kitchen and bathroom. It works well when the back yard is small or sloped, because the unit can use the existing foundation line and tie into utilities that are only a few feet away.

The tradeoff is privacy and sound. A shared wall needs proper fire and sound separation, and the design has to keep two front doors from feeling like one house. Attached units are also where Simi Valley's older rules were most restrictive, so the details below matter.

The old 50 percent cap and what replaced it

Ordinance 1349 limited an attached ADU built as an addition to 50 percent of the existing house or 800 square feet, whichever was larger, up to 1,000 square feet. On a 1,400 square foot ranch house in Rancho Simi that meant 800 square feet at most. HCD's October 29, 2025 findings faulted the section for not covering attached units on lots with new or multifamily dwellings and directed the City to rewrite it.

Separately, Government Code section 66321 says a city cannot cap an ADU below 850 square feet, or 1,000 square feet with more than one bedroom. Ordinance 1373 (reported adopted July 2026) is the City's response. Read its current size table before you size the unit; the 50 percent figure should not be your starting point.

White foam study model of a small backyard cottage alone on a wood table by a sliding door, an open yard and an oak beyond, AI-generated illustration
Illustration of a study model for an ADU.

How a job runs

  1. Walk-through and written estimate

    We look at the space with you, measure, and put the scope and price in writing. The estimate is free.

  2. Contract and permit

    A written contract with the terms California law requires, and the City of Simi Valley permit when the work needs one.

  3. Build, inspect, walk through

    The inspections the permit calls for, a final walk-through with you, and payments that follow the work as it is done.

Back yard with an open corner, an old shed and an oak, a tape measure and a blank notepad on a patio table, AI-generated illustration
Illustration of a back yard at the estimate.

Height, entrances and outside stairs

State law lets an attached ADU reach 25 feet or the height limit for the main house, whichever is lower. That is enough for a second-story unit over an attached garage or a family room, if the structure below can carry it.

HCD flagged two Simi Valley rules that shaped attached designs. The ordinance said the ADU's entrance should not face the street 'if possible', which HCD called a subjective standard. And it applied the City's setbacks for outside stairs (18 feet rear, 8 feet side) to stairs serving a second-story ADU, which HCD said exceeded state law because required stairs count as part of the ADU.

What changes in the main house

Adding an attached unit does not, by itself, require you to add fire sprinklers to the existing house; state law says ADU construction cannot trigger that. The shared wall still needs rated construction, and the new unit needs its own exterior access.

  • Plan the electrical service early: two dwellings on one service panel may need an upgrade.
  • Confirm where the new bathroom drains tie in before fixing the floor plan.
  • Keep the ADU's entrance and the house's front door clearly separate on the site plan.
Side yard walkway along a stucco house leading through an open gate to the entry door of a backyard ADU, AI-generated illustration
Illustration of a separate path to an ADU.

Questions homeowners ask

Is an attached ADU cheaper than a detached one?

Often, but not always. You save on a separate roof and long utility trenches, but you pay for opening the existing house, fire separation and matching the existing roofline. Competitor cost pages in Simi Valley mostly publish detached and garage numbers, so get bids on your actual plan.

Can I build the ADU above my garage?

Yes, an ADU over an attached garage is an attached ADU. The height limit is 25 feet or the house's limit if lower, and the garage walls and foundation usually need structural upgrades to carry a second floor.

Does the ADU entrance have to face the back?

Ordinance 1349 said it should not face the street 'if possible'. HCD found that wording subjective and not allowed for streamlined units. Ordinance 1373 (reported adopted July 2026) replaced the old ordinance; check its entrance rule for your plan.

What does the City charge to permit an attached ADU?

The City's July 1, 2024 schedule has one Accessory Dwelling Unit fee line for attached and detached units alike. For wood-frame construction, plan check plus inspection is $3,009 at 500 square feet and $3,551 at 1,000 square feet, before trade surcharges.

Sources

Facts on this page last verified: .

  1. HCD findings on Simi Valley ADU Ordinance No. 1349, October 29, 2025: https://www.hcd.ca.gov/sites/default/files/docs/policy-and-research/ordinance-review-letters/simi-valley-adu-findings-102925.pdf (2026-10-05)
  2. California Government Code section 66321 (size, height and setback floors): https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=GOV&sectionNum=66321. (2026-10-05)
  3. HCD ADU Handbook, updated for law in effect January 1, 2026: https://www.hcd.ca.gov/sites/default/files/docs/policy-and-research/adu-handbook-update.pdf (2026-10-05)
  4. Ordinance 1373 (reported adopted July 2026): the adopted text was not published online when this page was written. Confirm current local ADU standards with City of Simi Valley Building & Safety: https://www.simivalley.org/departments/environmental-services/building-safety-division/online-permit-submittal-instructions (2026-10-05)
  5. City of Simi Valley Summary of Service Charges, effective July 1, 2024 (FY2024-25): https://simivalleylibrary.org/wp-content/uploads/2025/02/CityofSimiValley_FeeSchedule2025.pdf (2026-10-05)
Utility trench running across a back yard to a new ADU slab, with conduit, water and sewer lines bedded in sand, AI-generated illustration
Illustration of utility trenching for an ADU.

A written estimate, free

We measure the space with you and put the scope and the price in writing. Under California law the down payment can never be more than $1,000 or 10 percent of the price, whichever is less.

Request a free estimate

How should we reach you?

We use what you send here to reply about this project, and, only if you ticked the email box, to send occasional tips by email. We do not sell or share it. Details in the privacy notice. Privacy.

No tracking cookies or analytics on this site. What you type here is stored only to answer your request.

Call

Monday to Saturday, 7am to 6pm

(818) 355-2301

Text: (818) 355-2301

(805) 864-2534

CSLB #925152 · B General Building Contractor