CSLB #925152 · Verify at CSLB
Building an ADU on a Simi Valley lot, start to finish
Detached, attached and garage ADUs in Simi Valley, built by a licensed local contractor.
Licensed general building contractor since 2008: CSLB #925152, qualifier Paul V. Aguilar.

Services




- How much an ADU costs in Simi ValleyWhat an ADU costs in Simi Valley in 2026: dated competitor ranges, City ADU permit fees, the 750 and 500 sq ft fee thresholds, and grant scam warnings.
- Getting an ADU permitted in Simi ValleyHow an ADU permit works in Simi Valley: Building & Safety, the 60-day approve-or-deny rule, HCD's 19 findings on Ordinance 1349, and Ordinance 1373.
The licence behind the work
- Licence CSLB #925152, Class B General Building
- Issued November 2008 by the Contractors State License Board
- Qualifier: Paul V. Aguilar
One local rule to know: 60 days. The state clock: once your ADU application is complete, the City must approve or deny it within 60 days. (California Government Code 66317)
How a job runs

Illustration of a back yard at the estimate. Walk-through and written estimate
We look at the space with you, measure, and put the scope and price in writing. The estimate is free.

Illustration of a study model for an ADU. Contract and permit
A written contract with the terms California law requires, and the City of Simi Valley permit when the work needs one.

Illustration of an ADU at final inspection. Build, inspect, walk through
The inspections the permit calls for, a final walk-through with you, and payments that follow the work as it is done.
A written estimate, free
We measure the space with you and put the scope and the price in writing. Under California law the down payment can never be more than $1,000 or 10 percent of the price, whichever is less.

Request a free estimate
Call
Monday to Saturday, 7am to 6pm
CSLB #925152 · B General Building Contractor
You can almost certainly add a unit to your Simi Valley property. State law (Government Code sections 66310 to 66342) requires the City to allow at least one ADU on a lot with a house, and on most single-family lots an ADU plus a junior ADU. The real questions are which type fits your lot, what it will cost, and how long the City takes to say yes.
This site answers those questions with sources you can check. Aguila Construction Inc is a B General Building contractor based in Simi Valley, licensed since 2008. Paul Aguilar, the license holder, walks your lot, tells you which ADU type the rules favor there, and builds it under a written contract.
Four ways to add a unit
Every ADU falls into one of four shapes. Which one makes sense depends on what is already standing on your lot: a detached two-car garage in the Texas Tract is a different starting point than a flat back yard in Rancho Simi or a sloped pad in Wood Ranch.
| Type | What it is | Size rule under state law |
|---|---|---|
| Detached ADU | A new freestanding unit in the yard | Streamlined path up to 800 sq ft with 4-ft side and rear setbacks; a city cap cannot sit below 850 sq ft (1,000 sq ft with more than one bedroom) |
| Attached ADU | An addition joined to the house | Same 850 / 1,000 sq ft floor; height up to 25 ft or the house limit, whichever is lower |
| Garage to ADU | An existing garage converted to a unit | Built within the existing structure, plus up to 150 sq ft to add ingress and egress |
| Junior ADU (JADU) | A unit carved out of the house itself | 500 sq ft maximum, entirely within the single-family home |

Where Simi Valley's own rules stand in 2026
Simi Valley's ADU ordinance has been in flux. On October 29, 2025 the state housing department (HCD) sent the City 19 written findings that Ordinance No. 1349, adopted June 5, 2023, did not comply with state law. Among them: the 6-foot separation the City required around detached ADUs, the City's 'act on' language instead of a clear approve-or-deny within 60 days, and the treatment of unpermitted structures that could legally become ADUs.
A replacement ordinance, No. 1373, was reported adopted in July 2026 to bring the rules in line. The adopted text was not published online when this page was written, so treat any number you see quoted from Ordinance 1349 as superseded and confirm current local standards with the City before design. The state floors in the table above apply either way.

What an ADU costs here, as published
No honest builder can price your ADU without seeing the lot, and Aguila has not published its own price list. What we can show you is the most recent dated range a Simi Valley competitor has published, and the City's own permit fee table, both on the cost page.
As one reference point, Safeway Remodel's page (factual update September 16, 2026) puts a 600 sq ft detached ADU in Simi Valley at roughly $240,000 to $330,000. That is their number, not ours. Use it to sanity-check the bids you collect.

Why a B general building license matters for an ADU
The Contractors State License Board says a B General Building contractor can build an ADU and may subcontract specialty trades as needed. A specialty-only contractor generally cannot run the whole job. Aguila holds a B license, CSLB #925152, current and active as of October 5, 2026.
CSLB also treats an ADU as a home improvement project. That means a written contract, a payment schedule tied to finished work, and a down payment limit, all of which you see summarized on every page of this site.
Questions homeowners ask
Can I build an ADU on my Simi Valley lot?
If your lot is zoned for residential use and has a house on it (or one proposed), state law requires the City to allow at least one ADU. On a single-family lot you can usually add one ADU and one JADU. Slope, easements and fire-zone construction rules shape the design, not the right to build.
Which ADU type is cheapest?
Converting space that already has walls and a roof usually costs less than building new. A JADU inside the house or a garage conversion avoids a new foundation and most of the framing. Safeway Remodel's September 2026 page shows a 400 sq ft garage conversion at roughly $130,000 to $180,000 against $240,000 to $330,000 for a 600 sq ft detached unit.
How long does the City have to approve my ADU permit?
Government Code section 66317 gives the City 60 days from a complete application to approve or deny it when a house already exists on the lot. If it does neither, the application is deemed approved. A denial must come with a full set of comments explaining how to fix it.
Do I have to live on the property?
Not for an ADU. State law bars owner-occupancy requirements on ADUs. A JADU is different: if it shares a bathroom with the main house, the owner must live in the house.
Does Aguila handle the permit?
Yes. The plans are submitted to City of Simi Valley Building & Safety, not Ventura County, and Paul coordinates the corrections and inspections through final.
Sources
Facts on this page last verified: .
- HCD findings on Simi Valley ADU Ordinance No. 1349, October 29, 2025: https://www.hcd.ca.gov/sites/default/files/docs/policy-and-research/ordinance-review-letters/simi-valley-adu-findings-102925.pdf (2026-10-05)
- California Government Code section 66321 (size, height and setback floors): https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=GOV§ionNum=66321. (2026-10-05)
- California Government Code section 66317 (60-day approve or deny): https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=GOV§ionNum=66317. (2026-10-05)
- Ordinance 1373 (reported adopted July 2026): the adopted text was not published online when this page was written. Confirm current local ADU standards with City of Simi Valley Building & Safety: https://www.simivalley.org/departments/environmental-services/building-safety-division/online-permit-submittal-instructions (2026-10-05)
- Competitor's published range: Safeway Remodel, ADU cost in Simi Valley (factual update September 16, 2026): https://www.safewayremodel.com/blog/adu-cost-simi-valley-2026 (2026-10-05)
- CSLB Fast Facts: Tips for Building a Residential ADU (2025): https://cslb.ca.gov/Resources/GuidesAndPublications/2025/FastFacts_ADU.pdf (2026-10-05)